(574) 800-4334

Epoxy Flooring in Edwardsburg, MI

South Bend Premier Epoxy Flooring installs epoxy flooring in Edwardsburg, MI, along with garage floor coatings, polyaspartic floors and basement epoxy for houses all over the village.

Request a quote

Tell us which floor and what it looks like today. We will call you back.

Only used to reply to you. It is never added to a mailing list or passed on.

About 28% of Edwardsburg homes were built in 1990 or later. A garage slab that young looks perfect, and that is the trouble: a power-troweled floor is dense and glassy, and some got a cure-and-seal when they were poured. Epoxy cannot grip either one. So even a clean new floor gets ground to an open profile before the first coat, or the coating peels in a few winters.

  • Newer slabs ground open so the coating grips
  • Prewar garage floors repaired before coating
  • Radon pipes planned before a basement is coated
  • About 29 minutes from South Bend
Power screed leveling a fresh concrete slab

Epoxy Flooring Across Edwardsburg

Edwardsburg's housing comes in three kinds: newer subdivision houses, village homes from before 1940, and manufactured homes, which make up 28.6% of the count.

  • Cracked concrete slab with a worn, stained surface

    Prewar Garages in the Village

    A quarter of the village's housing was built in 1939 or earlier, and the garage is often the oldest concrete on those lots. Look for settled sections, cracks at the old joints and a worn top layer. We level what can be leveled, fill the cracks and grind down to sound concrete. Then we tell you straight whether the slab is worth a full flake system.

  • Small bubbles on a gray surface

    Detached Garages and Moisture

    The residential code doesn't ask for a vapor retarder under a garage slab, and a detached garage on its own pad usually has none. If moisture is coming up from below, you'll see bubbles or lifting at the edges of an old coating. We test before we quote, and if the slab is damp, the system starts with a primer made to hold vapor back.

Radon Pipes Before a Basement Coating

Cass County is in radon Zone 1, the group with the highest potential. So if you plan to test your basement for radon, be sure to do it before the floor gets coated. A fix typically means a pipe through the slab and a fan, and the hole for that pipe should be cored first, so the coating goes down in one piece around it. A coating does seal cracks and pores, but we never sell it as radon control. Test again once the system is running.

Metallic Floors in Newer Basements

Today’s code asks for a vapor retarder under a heated basement slab, and Edwardsburg houses built from 1990 on are the likeliest to have one. That makes their basements good candidates for a metallic epoxy floor, which shows every flaw and every damp spot under it. We still test before we pour. Then we grind the slab flat and fill the control joints, because a metallic coat flows into any low spot and pools there. In the older village houses, the test comes first and the color choice after.

Getting to Edwardsburg

Edwardsburg is about 15 road miles from South Bend, roughly 29 minutes north across the Michigan line. Grinding, coating and topcoat take several days, and we book them back to back, so your floor is never left half done between visits.

We also serve Cassopolis, MI, the Cass County seat, on Diamond Lake.

What Shapes Epoxy Flooring Work in Edwardsburg, MI

Edwardsburg has a population of about 1,287. Here is what that means for the work we do here.

Local factDetail
Homes from 1990 onAbout 28% of Edwardsburg housing, with 10.4% from the 2010s alone.
Prewar homes26.1% of the village's homes were built in 1939 or earlier.
Manufactured homes28.6% of the housing units counted in the village.
Radon zoneCass County is in radon Zone 1, the group with the highest potential.
Lakes nearbyEagle Lake and Christiana Lake are the largest in Ontwa Township.
Village and countyEdwardsburg is a village in Ontwa Township, Cass County, Michigan.

Price your floor

Give us the rough size of the room, what the slab is doing now (stains, cracks, an old coating) and how you use the space. We call back with the system that fits and what would raise or lower the figure.

Services we offer in Edwardsburg

Frequently Asked Questions

How soon can a new slab be coated?

Wait at least 28 days after the pour. Concrete keeps giving off water while it cures, and if a coating goes over it too early, it can blister.

Will the coating turn yellow in sunlight?

Epoxy can darken or yellow, most of all where the sun comes in through an open door. A polyaspartic topcoat is UV stable, so we put it over the epoxy on any floor that sees daylight.

Can the coating run up the wall a few inches?

Yes. Carrying it four to six inches up the concrete stem wall keeps snowmelt off the bottom of the drywall and makes the edge easy to hose clean.

How soon can I put things back in the garage?

Light shelving and bins can go back after about two days in warm weather. Cars and heavy tool chests wait longer, since a full cure takes about a week.

Which finish hides dirt from a gravel driveway best?

A full flake broadcast in a medium tone, such as gray with tan and black chips. Solid light colors show every tire track, and dark solids show dust.

Can a pole barn floor be coated?

If it is concrete, yes, with the same grinding and testing as a garage. Gravel or packed dirt has to be poured over first, since a coating needs a slab under it.

Request a quote

Quickest is a call to (574) 800-4334. Or tell us about the slab here and someone will phone you.

Only used to reply to you. It is never added to a mailing list or passed on.

Call (574) 800-4334Check my floor